NPIWC-II

The Project aims to replicate the success achieved in National Program for the Improvement of Watercourses Phase-I and to enhance the agriculture growth in Pakistan. The broad objectives of the proposed project (NPIWC-II) are the social mobilization through capacity building of Water User Associations (WUAs), minimize the water conveyance and on farm water application losses, reduction in water logging and salinity, equity in water distribution, reduction in water distribution disputes, reduce the poverty through employment generation in agriculture sector and to increase the crops yield.

Project Components

NPIWC-II

The Project aims to replicate the success achieved in National Program for the Improvement of Watercourses Phase-I and to enhance the agriculture growth in Pakistan. The broad objectives of the proposed project (NPIWC-II) are the social mobilization through capacity building of Water User Associations (WUAs), minimize the water conveyance and on farm water application losses, reduction in water logging and salinity, equity in water distribution, reduction in water distribution disputes, reduce the poverty through employment generation in agriculture sector and to increase the crops yield.

Project Components

PROJECT OUTPUTS

PROJECT OUTPUTS

  1. Mobilization through capacity building of Water Users Associations.
  2. Reconstruction/renovation and remodeling of 47,278 watercourses, involving complete earthen renovation, partial lining of critical reaches and installation of water control structures.
  3. Construction of 14,932 water storage tanks with 60% subsidy,
  4. Provision of 11,610 Laser Land Levelers at 50% cost sharing, with the expectation to save about 50% irrigation water for wheat and about 68% of irrigation water for paddy.

PROJECT BENEFITS

PROJECT BENEFITS

123 AF

47,278

5.28 MAF

Water saving per Watercourse per annum

Watercourses to be improved

Estimated water to be saved per annum

$ 400 Million

PKR 65.8 Billion

$2.328 Billion

PKR 383.02 Billion

PKR 372.5 Billion

Estimated Economic Value per MAF

Total Economic Benefit due to water saving

Total saving

PROJECT BENEFITS

PROJECT BENEFITS

123 AF

Water saving per Watercourse per annum

47,278

Watercourses to be improved

5.28 MAF

Estimated water to be saved per annum

PKR 65.8 Billion

Estimated Economic Value per MAF

PKR 383.02 Billion

Total Economic Benefit due to water saving

PKR 372.5 Billion

Total saving

PROJECT IMPACTS

PROJECT IMPACTS

  1. Reduction in Water Logging and salinity in project areas to the extent of 10%.
  2. Cropping intensity is expected to increase by 5-20%.
  3. Crops yield is estimated to increase by 10-15%.
  4. Equity in water distribution increased by about 30%.
  5. Reduction in water disputes/thefts and litigation amongst the Farmers over water distribution by about 80%.
  6. Help poverty reduction through generation of employment.
  7. Self-sufficiency in food through utilization of water saved for edible oilseed production.

“A FOOD SECURE PAKISTAN”